English
2016: SETTING AND INFRASTRUCTURE (English)

2016: SETTING AND INFRASTRUCTURE (English)

The constructing of newer buildings in UNS always considers the balance between land availability and green space. The new high-rise building (>4 floor) is built in an attempt to achieve this balance, which eventually increases the precentage of the green space,  land use efficiency and also the utilization of integrated building. It is for example, the 8-floor central library building of UNS. This building functions not only as the center library of UNS, but also it functions as the exhibition room, integrated commercial facility and multipurpose room. All of these function rooms can be used by all study programs in UNS and it can even be functioned as commercial lease for stake holders.

read more…

@2016. greencampus UNS